PaulS
Touchdown! Greaser!
8 hours of labor to change tire is nuts. The ~260 for shipping is also nuts. A consumables surcharge + another charge for hydraulic fluid is double dipping. What a douche.
The labor seems excessive for the tire, it does say dispatch tech to airplane, maybe there is travel involved, plus the wheel needs to be sourced, was it picked up? The shipping is probably overnight.