Maybe. Are you signing a 100 hr off in the book? If so, what will the write up state? I used to do something similar but I signed off a complete 100hr via Appendix D and I also checked the ADs due to the reference i posted above. Splitting hairs with "91 required inspection" could leave you open in the future as there is no regulatory path to separate a complete 100 vs a 90% 100 insp unless stated in your sign off.then I think it would fall back under RTS only for work performed.