flyingcheesehead
Taxi to Parking
Hi all,
I have a basement that is half finished, and I'm planning to start making more use of the unfinished side as a workshop/project area. I'm looking for some ideas on how to make it a nicer space, without going to the expense of finishing it.
The basic configuration has the stairs in the middle, which turn 90 degrees toward the finished side. It's a little bit odd in that the finished and unfinished sides are split on the long axis of the house, so it's somewhat narrow. The unfinished side has furnace, water heater, water softener, sump, radon mitigation system, and electrical panel so fully finishing it would make it into a pretty weird shape anyway.
Three walls of the unfinished side are concrete, the fourth is the back of the finished side so mostly exposed insulation and studs. The ceiling is open (wooden joists), with plenty of romex, coax, ducts, etc running through it.
Has anyone done something like painting the concrete, adding vinyl flooring, etc? In the context of a basement with the various moisture issues that might be encountered (no leaks, FWIW), what is and isn't advisable?
Thanks for any ideas!
I have a basement that is half finished, and I'm planning to start making more use of the unfinished side as a workshop/project area. I'm looking for some ideas on how to make it a nicer space, without going to the expense of finishing it.
The basic configuration has the stairs in the middle, which turn 90 degrees toward the finished side. It's a little bit odd in that the finished and unfinished sides are split on the long axis of the house, so it's somewhat narrow. The unfinished side has furnace, water heater, water softener, sump, radon mitigation system, and electrical panel so fully finishing it would make it into a pretty weird shape anyway.
Three walls of the unfinished side are concrete, the fourth is the back of the finished side so mostly exposed insulation and studs. The ceiling is open (wooden joists), with plenty of romex, coax, ducts, etc running through it.
Has anyone done something like painting the concrete, adding vinyl flooring, etc? In the context of a basement with the various moisture issues that might be encountered (no leaks, FWIW), what is and isn't advisable?
Thanks for any ideas!