peter-h
Line Up and Wait
I have a European based N-reg aircraft and a field approval is the only way to do this. B&C have a few STCs but nothing applicable. Well, the content of an STC can be used to support a field approval, if not the STC (number) itself.
I started a guy in the USA on this a couple of years ago but he got busy and never finished. He did some wiring diagram(s) and I paid him up to date for his time.
There is a time slot in Jan+Feb 2018 when the aircraft will be in a heated hangar (for a TKS installation) and it would be the ideal time to do it. I don't think it is more than a day or two's work for someone who knows the process, followed by a meeting with his FSDO. You start with the B&C IM. The engine has a spare vac pump drive (currently blanked off) which is perfect for the alternator.
I have asked loads of people and nobody has time, which is why I am posting here
I started a guy in the USA on this a couple of years ago but he got busy and never finished. He did some wiring diagram(s) and I paid him up to date for his time.
There is a time slot in Jan+Feb 2018 when the aircraft will be in a heated hangar (for a TKS installation) and it would be the ideal time to do it. I don't think it is more than a day or two's work for someone who knows the process, followed by a meeting with his FSDO. You start with the B&C IM. The engine has a spare vac pump drive (currently blanked off) which is perfect for the alternator.
I have asked loads of people and nobody has time, which is why I am posting here