Chicago Bearhawk
Pre-Flight
- Joined
- Apr 4, 2018
- Messages
- 58
- Display Name
Display name:
Chicago Bearhawk
I can't understand why the required equipment line has "RNP APCH." listed for the following approach:
https://aeronav.faa.gov/d-tpp/2108/05811RA.PDF
Very specifically, I read:
https://www.faa.gov/about/office_or...nss/library/factsheets/media/RNAV_QFSheet.pdf
Several times and assume that LP or LNAV lines must exist to have the RNP APCH.
This is a similar question to some other questions however, here is the significant difference from other links on POA, in this case there is only 1 line and it is for "Circling".
https://aeronav.faa.gov/d-tpp/2108/05811RA.PDF
Very specifically, I read:
https://www.faa.gov/about/office_or...nss/library/factsheets/media/RNAV_QFSheet.pdf
Several times and assume that LP or LNAV lines must exist to have the RNP APCH.
This is a similar question to some other questions however, here is the significant difference from other links on POA, in this case there is only 1 line and it is for "Circling".