Tiedown spot options?

Eddie, are you going to sink tie-down rings into the concrete? I didn't notice anything in the photo, but it was taken from a distance.
 
I bought 4 eyebolts* and bolted metal plates to them:

37749734424_971c225fe7_z.jpg


Also bought some 4” PVC couplers to serve as “surrounds”:

26688211969_d4ae1f49cc.jpg


I think you can zoom into my earlier photos and see them in place.

I dug down just over a foot and placed the rings flush with where the concrete will be, and poured some Quickrete around them. I think that, plus the concrete in the slab above them should be pretty secure.


*My Sky Arrow ties down best at the wings and nose. But I wanted other planes to be accommodated, so I placed one at the tail as well.
 
Very cool!

I have this image of your plane being carried away in a high wind, with the slab still strapped to it...
 
When I order concrete I plan on a little extra and have a plan for pouring the extra on my site. maybe a ramp up to the slab...

That, sir, is an excellent idea.

We plan on back-filling the area around the slab, so not much of a ramp will be needed.

But I may place a form for an extension that could hold the utility box seen in the photos, where I keep tiedowns, fuel and misc supplies. I can keep one side “mobile”, something like...

37765757404_8eeefc1dc9_z.jpg


Maybe order an extra half-yard to be safe.

Thanks for the suggestion!
 
Plus, Eddie, you never get ALL the concrete out of a truck. Most plants will batch a bit extra to account for this but one never knows.

Also, the truck might want to "wash out" the drum somewhere in the immediate area. Is there a ditch nearby that could stand to be lined with a concrete slurry mix? They'll leave the "wash out" in a pile...you'll need to contour it, easy enough to do though as long as you're not too busy with your slab at the same time.
 
How did I miss this thread? Great work Eddie, nice project.
 
Buried cinder blocks would be my call. I like the look and the cost is right. You could inexpensively improve your anchoring by driving some rebar diagonally through the holes in a cinder block an X shape to hold the block down.

Second would be Matson mat. $900 to get the mat, then a lot of crushed stone under it.
 
When I order concrete I plan on a little extra and have a plan for pouring the extra on my site. maybe a ramp up to the slab...

Worked on finalizing things today, and took your advice:

37813308744_dd915e7f90_z.jpg


If there’s excess, I’ll have it added to that little extension. I left one side movable, so I can expand it to take whatever extra concrete is available.

Thanks for the advice!
 
Worked on finalizing things today, and took your advice:

37813308744_dd915e7f90_z.jpg


If there’s excess, I’ll have it added to that little extension. I left one side movable, so I can expand it to take whatever extra concrete is available.

Thanks for the advice!
Yeah, thats exactly what I do. Much better than possibly running short on the main slab.
 
The deed is done!

37709384795_5f882e550c_z.jpg


38597555281_df684d0427_c.jpg


38564610942_c274f42174_c.jpg


24725143398_5de233527d_z.jpg


38540279976_5a11c77515_c.jpg


The fellow who delivered the concrete was a big help - working the bull float looks likes it takes some finesse.

We had to extend the extension another 6’ or so to take all the extra concrete. Thanks again forane! 4 yards altogether got the job done.

Thanks again for all the help!
 
Last edited:
Nice job, dude!!

Just one more suggestion if I may...don't gag your lolly in getting it back filled. The worse thing that can happen now is to have rain runoff undercut it by washing some of the gravel out from under it.

Re-establishing proper sub grade compaction if this happens is damned near impossible.
 
The deed is done!

37709384795_5f882e550c_z.jpg


38597555281_df684d0427_c.jpg


38564610942_c274f42174_c.jpg


24725143398_5de233527d_z.jpg


38540279976_5a11c77515_c.jpg


The fellow who delivered the concrete was a big help - working the bull float looks likes it takes some finesse.

We had to extend the extension another 6’ or so to take all the extra concrete. Thanks agai forane! 4 yards altogether got the job done.

Thanks again for all the help!
The driver was a hellofahand to work like that. Pours I’ve been on all the driver does is press the levers and wash down. Of course we always had more than one guy on hand...
 
Looks great can't wait to see an airplane parked on it.
 
What! Where's all those POAers who were gonna help! Like Clark said you're fortunate that driver helped. Ones I've dealt with just do their truck part. Looking good though.
 
Thanks, all!

I stopped by the property briefly today and the concrete is just starting to “whiten” in patchy areas. Some tiny paw prints, but barely noticeable.

Just one more suggestion if I may...don't gag your lolly in getting it back filled. The worse thing that can happen now is to have rain runoff undercut it by washing some of the gravel out from under it.

Re-establishing proper sub grade compaction if this happens is damned near impossible.

Good point. We should start excavation shortly for our pole barn - look for a separate thread on that. But that’s when we’ll have equipment on site and dirt available to back fill.

Which leads to 3 questions:

1) When will it be safe to knock off the forms?

2) My friend asked what the purpose of the gravel was, and I wasn’t really sure.

3) It seemed like the concrete was liquid enough to flow into the couple of inches of gravel, and then set. Does it?

Thanks again - this has been educational, and I’ll never look at concrete slabs the same way again!
 
I have only poured small pads, less than 4' wide and it is easy to screed it level, but how is it done on wider pads?
 
In one of the photos above, you should see us using 2 2x4’s screwed together as a screed. Over 16’ long to get a grip on the ends, but manageable. Not sure at what size it would become problematical.

As an aside, I did set the forms up for a 2” drop over the 20’ length back to front for drainage. I had read 1” in 8’ was desireable, but figure I got close enough.
 
Last edited:
What should be the final cost breakdown:

38617578731_9fef42853a.jpg


Way better than the $3,800 estimate.

Then again, a LOT of labor went into that slab. The fact that my time is worthless probably helped a lot!
 
Last edited:
1. Forms can be removed the following day if you didn't pour it too wet.

2. In areas where the soil is clayey using crushed stone under the concrete allows water to drain, thus preventing it from standing under the concrete. The gravel subbase is known as a "drainage course." In areas of very sandy soil that drain well, one can get by with a thin "sand leveling course" under the slab. Dry subgrade is stronger and frost heaves less than saturated subgrade.

3. Yes.
 
Very cool project.

So I have an extremely dumb question but there seem to be a number of concrete experts here, so here goes.

How in the world do they pour steeply sloped driveways and pads? I’ve always wondered that my entire life, honestly.

I always figured they make it very dense but doesn’t it still want to run downhill like a very slow mudslide?

I’m not talking steep enough that they terrace it in multiple pours, but steep enough you’d think it would all run downhill somehow before it set.
 
Very cool project.

So I have an extremely dumb question but there seem to be a number of concrete experts here, so here goes.

How in the world do they pour steeply sloped driveways and pads? I’ve always wondered that my entire life, honestly.

I always figured they make it very dense but doesn’t it still want to run downhill like a very slow mudslide?

I’m not talking steep enough that they terrace it in multiple pours, but steep enough you’d think it would all run downhill somehow before it set.
Angle of repose. The aggregate by itself will not “flow” until its angle of repose is exceeded. The angle can be viewed/measured at any sand pile. Add in a properly dry mix (google slump test) and you see how the properties of a cement slurry can be tailored to avoid problems with flow. Throw in some CaCl and the slurry will set quickly. Do not throw in sugar by mistake...

Anyway, from a practical point of view just use the mix spec’d for curbs and you’ll be fine. That stuff can almost be stacked.
 
Looks great Eddie! When does the steel building get set on it? :)
 
Got back up to the property Monday, and knocked off the forms yesterday and hacked out the tiedown rings - photos to follow.

Looking good, but...

All of the sides of the slab look nice and solid - except the back, which has gaps. I think the word is “honeycombed”. Even though I was tamping down with a hard rake, I recall that right after the pour started the driver suggested he needed to add some water to the mix. Hence, that very first pass might have been a tad “dry”.

Question: is it worth my while to fill it in before backfilling? If I don’t it sure seems water could intrude and freeze, causing problems. And if I do, what should I trowel in there? I have a partial bag of Quickcrete I could mix up, but some sort of premix from a bucket or even a caulking gun would be less of a chore.

Thanks yet again in advance!
 
Got back up to the property Monday, and knocked off the forms yesterday and hacked out the tiedown rings - photos to follow.

Looking good, but...

All of the sides of the slab look nice and solid - except the back, which has gaps. I think the word is “honeycombed”. Even though I was tamping down with a hard rake, I recall that right after the pour started the driver suggested he needed to add some water to the mix. Hence, that very first pass might have been a tad “dry”.

Question: is it worth my while to fill it in before backfilling? If I don’t it sure seems water could intrude and freeze, causing problems. And if I do, what should I trowel in there? I have a partial bag of Quickcrete I could mix up, but some sort of premix from a bucket or even a caulking gun would be less of a chore.

Thanks yet again in advance!
Eddie--

It happens all the time, even on those beautiful concrete columns along the interstate...and it's easy to fix. If you want pristine sides just use a bag of quickcrete, without the gravel component, and trowel that into the honeycombed areas, btw, this is called 'point and patch' easy to do especially if you're worried about aesthetics.

D.
 
Yamaha TW200?

Yep!

My KTM 950 Adventure was just starting to feel too intimidating, so about 6 months ago I sold it and bought the 2017 “TDub”.

Which is an absolute hoot, both on and off-road.

Wringing every last ounce of performance from 196cc and 16hp is a whole new challenge!

Earning my “Dragon” about a month ago:

37177671304_89507e0965_z.jpg


Drop by our TN digs and let’s ride!
 
Last edited:
Yep!

My KTM 950 Adventure was just starting to feel too intimidating, so about 6 months ago I sold it and bought the 2017 “TDub”.

Which is an absolute hoot, both on an off-road.

Wringing every last ounce of performance from 196cc and 16hp is a whole new challenge!

Earning my “Dragon” about a month ago:

37177671304_89507e0965_z.jpg


Drop by our TN digs and let’s ride!
We had a bunch of those at the motorcycle training school I taught at a few years back. Almost indestructible fun little machines.
 
Very cool project.

So I have an extremely dumb question but there seem to be a number of concrete experts here, so here goes.

How in the world do they pour steeply sloped driveways and pads? I’ve always wondered that my entire life, honestly.

I always figured they make it very dense but doesn’t it still want to run downhill like a very slow mudslide?

I’m not talking steep enough that they terrace it in multiple pours, but steep enough you’d think it would all run downhill somehow before it set.

How steep? Unless they are super steep, its no problem. Concrete will stay where it is until hardened. You might have to pour it a bit dryer than usual. If it gets incredibly steep, then special measures have to done, but that would be way steeper than any normal very steep driveway. (Steepest interstate grade is 6%, steep driveway is 12%. Those are percent not degrees btw). Could easily pour 20% grade with no special techniques, just use a dry mix.

Something that DOES have to be designed for even with gently sloping concrete is anchoring. Concrete pads have a tendency to creep downhill over the years. This is done by having a flat heavy concrete pad at the bottom and/or caissons (deep piers) steel tied to the slab. Or something else.

  • less than 30-degree slope--2- to 4-inch slump
  • 30- to 45-degree slope--1- to 3-inch slump
  • more than 45-degree slope--double forming may be considered for concrete thickness of about 6 inches or more [or shotcrete should be used]
 
Last edited:
Thanks @coloradobluesky — I just always wondered. My ramp up to my house from the driveway is fairly steep and we’ve thought about doing a pad there, but we have friends with houses on hills that have way steeper concrete up from the road. Just a curiosity.
 
Last edited:
Good thing aesthetics don’t count:

38027112704_3a9ab02e9d_z.jpg


Still, filled in the gaps and should at least delay water intrusion.

Speaking of aesthetics, once I chipped out down to the 4” PVC sections, the edges looked rough:

23879327067_3dfa579e64_z.jpg


Note: the upper edge of the PVC is actually smooth ~ what makes it look ragged is remnants of the black duct tape I used to tape them off.

Looked for at Home Depot flanges for and found these:

38743671671_4735ff34ed_z.jpg


Of course, many will see these and think “toilet”, but that’s their problem!
 
if it prevents chafing of your tie down ropes or chains, who cares. Nice job.
 