Progress update...
Over the last several days I filled in and leveled the gravel, got the rebar, cut it to size, and placed it with the supports.
In (back breaking and tedious) progress as caught by Karen:
(As a data point, neither of the tiedown slabs on the other side of the runway utilized rebar and to date neither has cracked.)
Pretty much ready for the pour:
I'm thinking 4 yards will be enough, per this online calculator:
Looks close, but the 16x20 was the
outside dimensions of the forms, and 2x4's are apparently only 3.5" wide. I don't want to come up short, since there's a $100 fee for the truck to fetch more.
Anyway, watching the weather forecasts for next week and ready to schedule the pour. Still open to anyone wanting to drop in and help/supervise!
As an aside, costs so far:
Even with the concrete and tool rental/purchase, I should still be under 50% the original estimate of $3,800 all in from the contractor. Assuming my labor has no value!