jaybee
Cleared for Takeoff
Need to put a new system in the house I recently bought. I grossly underestimated the cost of a new system when I bid the purchase of the house.
So I'm looking for two cents worth on what I could get by on if I choose to go bare minimum and how much I would actually save on electricity if I went all out on a 20 SEER premium model. (I've seen website claims...)
Current system best I can tell is 14 or 16 SEER. The circuit board on the air handler was bypassed with a wire and neither the heat pump or backup electrical grid heat work. The bottom of the condenser is completely rotted out though the amp draw on the motor is middle of the road and A/C side works just fine.
House is in Central Florida, 1910 sq ft living space, 5 windows, 1 patio door, block construction with stucco though the stucco is barely a scratch coat in reality.
I can do a Goodman system installed for like $5000 though reports on their quality vary widely while a top of line Trane or likewise will run 10 - 12 grand !!! (I know that there only a few manufacturer's and some come down the same assembly line with different names...)
No one had made a bid saying that any ductwork needs to be done but most are bidding a 3 ton system with the option to purchase a 4 ton. I've started a spreadsheet because its nigh impossible to compare one quote to another as they vary wildly with what is included and what is not included.
Thanks for any help.
So I'm looking for two cents worth on what I could get by on if I choose to go bare minimum and how much I would actually save on electricity if I went all out on a 20 SEER premium model. (I've seen website claims...)
Current system best I can tell is 14 or 16 SEER. The circuit board on the air handler was bypassed with a wire and neither the heat pump or backup electrical grid heat work. The bottom of the condenser is completely rotted out though the amp draw on the motor is middle of the road and A/C side works just fine.
House is in Central Florida, 1910 sq ft living space, 5 windows, 1 patio door, block construction with stucco though the stucco is barely a scratch coat in reality.
I can do a Goodman system installed for like $5000 though reports on their quality vary widely while a top of line Trane or likewise will run 10 - 12 grand !!! (I know that there only a few manufacturer's and some come down the same assembly line with different names...)
No one had made a bid saying that any ductwork needs to be done but most are bidding a 3 ton system with the option to purchase a 4 ton. I've started a spreadsheet because its nigh impossible to compare one quote to another as they vary wildly with what is included and what is not included.
Thanks for any help.