Sounds about right. Need to also include engineering into that which would have to be conducted through the Airport’s on-call engineers.I’m guessing 1000 sq ft for standard t hangar? So $275,000 construction costs?
No, assuming it’s a land lease, it should only be an annual payment for the length of the lease.So $2,750 per month is what it should rent for?