- Joined
- Jun 7, 2008
- Messages
- 23,967
- Display Name
Display name:
Bob Noel
My googlefu is failing me...
Any words of wisdom with respect to how thick a pour should be over an existing slab of concrete? (assume the existing concrete is properly prepared)
Situation: existing unheated sunroom in the northeast (built 10 years ago). Existing slab has apparently settled a bit. Under the tiles is some wood framing on top of a slab (not an ideal job). I might was to remove the wood framing and build up the subfloor with more concrete and/or cement board or... just remove entire floor and start again.
Thanks
Any words of wisdom with respect to how thick a pour should be over an existing slab of concrete? (assume the existing concrete is properly prepared)
Situation: existing unheated sunroom in the northeast (built 10 years ago). Existing slab has apparently settled a bit. Under the tiles is some wood framing on top of a slab (not an ideal job). I might was to remove the wood framing and build up the subfloor with more concrete and/or cement board or... just remove entire floor and start again.
Thanks