More like the Feds baited and switched, what they have no idea how many airplanes had to be done? and what the wait to install is? Poor planning for sure and actually unfair to many owners, there should have been enough rebates for all installs, those not done by 12-31-2019. or purchased and not installed but have a date to install, now that would have been fair. But then who says anything gov is fair
They want the equipment installed in the name of safety, yet with thousands of airplanes not done, run out, I call BS meter pegged.
I wonder how many airplanes will not get done now, as this was not exactly cheap to do.