Any plastic fairings for Cessna-172

We continue to expand the range of plastic parts. Due to the high strength, the warranty period will have to be extended.
 
In addition to the Cessna-172, we make parts for the Cessna 150, 182, 337
 

Attachments

  • 150-152.jpg
    150-152.jpg
    46.7 KB · Views: 32
  • 59900595_10211107135792648_8736682113991966720_o.jpg
    59900595_10211107135792648_8736682113991966720_o.jpg
    60 KB · Views: 33
  • 1606449987810.jpg
    1606449987810.jpg
    77.2 KB · Views: 34
  • 1606449987837.jpg
    1606449987837.jpg
    94.3 KB · Views: 33
  • 1611218860392.jpg
    1611218860392.jpg
    68.5 KB · Views: 32
  • 1611218860410.jpg
    1611218860410.jpg
    60.9 KB · Views: 35
  • processed.jpeg
    processed.jpeg
    162.9 KB · Views: 33
Central Console C-172
 

Attachments

  • Central Console C-172XP.jpg
    Central Console C-172XP.jpg
    42.6 KB · Views: 41
  • изображение_viber_2021-05-10_15-38-57.jpg
    изображение_viber_2021-05-10_15-38-57.jpg
    88.6 KB · Views: 35
  • изображение_viber_2021-05-10_15-38-57-.jpg
    изображение_viber_2021-05-10_15-38-57-.jpg
    76.4 KB · Views: 35
  • изображение_viber_2021-05-12_16-49-19.jpg
    изображение_viber_2021-05-12_16-49-19.jpg
    113.3 KB · Views: 34
bottom line is these parts are illegal to install in the US on a certified aircraft. period.
 
You are absolutely right, the near future will be absolutely legal.
Certification work is actively underway and is doomed to success.
Why?
Because our parts are stronger, because they are lighter, because their service life is many times higher.
 
You are absolutely right, the near future will be absolutely legal.
Certification work is actively underway and is doomed to success.
Why?
Because our parts are stronger, because they are lighter, because their service life is many times higher.
good luck, and i wish you well on certification.
 
For now, we will limit ourselves to a warranty period of 5 years.
And mastered the production of glasses.
 

Attachments

  • 1586686821179.JPEG
    1586686821179.JPEG
    143.1 KB · Views: 38
For now, we will limit ourselves to a warranty period of 5 years.
And mastered the production of glasses.
and you still have not received PMA or FAA approval, so they are still illegal to install on a certified aircraft.
 
Couldn't they be installed as OPP assuming the IA was in agreement?
 
Couldn't they be installed as OPP assuming the IA was in agreement?
Not by simply purchasing them. To qualify for OPP the owner needs to be involved in one of 5 ways. For example, if you were to send meglin a copy of the OEM drawing for the part and he then produced them per that drawing for you then sure you could go the OPP. But at present, actively selling and advertising these parts for install on a TC aircraft violates both Part 21 and Part 3. So as mentioned above they aren't legal to install in their present form. I suppose an AP could pursue an alteration under their certificate or at a higher level but one big road block is the parts are produced outside the US in a country without a bilateral agreement if I recall correctly.
 
I am afraid that after receiving approval, no one will take parts from other manufacturers :).
FAR 21.303 b states owner and operator may make or have made replacement or modified parts for their own equipment, airlines, FAR 122, 135 and part 91 and 137 can and do this in order to maintain their own equipment!
 
Weather radar radome for C-210 and 337
 

Attachments

  • 105632021_1265438207132324_5610449944142598652_n.jpg
    105632021_1265438207132324_5610449944142598652_n.jpg
    63 KB · Views: 23
  • 105705776_1265438727132272_2101166286421737267_n.jpg
    105705776_1265438727132272_2101166286421737267_n.jpg
    50.1 KB · Views: 22
Have they been fire tested? I can't see these going inside a cabin without meeting FAA burn testing criteria.

At annual, if there is any question, the IA will have final say on your OPP parts and if he wants to sign off an Airframe with them. He may never see them, or it may be the first thing they check for. Be ready to take the risk.
 
We have resumed production of glazing for the C-172, Socata Rally, Yak-52, Zlin-42/43, Al-60 Aeromacchi Lockheed.
 
Last edited:
Here are some samples. The material used is PLEXIGLAS® Cast Acrylic, thickness 3.4.5 mm.
 

Attachments

  • изображение_viber_2022-01-01_16-06-03-092.jpg
    изображение_viber_2022-01-01_16-06-03-092.jpg
    76.1 KB · Views: 22
  • изображение_viber_2022-01-01_16-06-06-485.jpg
    изображение_viber_2022-01-01_16-06-06-485.jpg
    191.8 KB · Views: 23
  • изображение_viber_2022-01-01_16-04-51-541.jpg
    изображение_viber_2022-01-01_16-04-51-541.jpg
    86.4 KB · Views: 22
  • IMG-309c2bdcd683d1f3555885142c241fe6-V.jpg
    IMG-309c2bdcd683d1f3555885142c241fe6-V.jpg
    175.5 KB · Views: 23
Production of a 15" diameter weather radar fairing has been mastered.
 

Attachments

  • изображение_viber_2024-01-25_13-35-41-036.jpg
    изображение_viber_2024-01-25_13-35-41-036.jpg
    236.9 KB · Views: 13
  • изображение_viber_2024-01-25_13-35-41-295.jpg
    изображение_viber_2024-01-25_13-35-41-295.jpg
    222.9 KB · Views: 13
  • изображение_viber_2024-01-25_13-35-41-514.jpg
    изображение_viber_2024-01-25_13-35-41-514.jpg
    171.6 KB · Views: 13
C-172 Interior Details
 

Attachments

  • 1608587571545.JPEG
    1608587571545.JPEG
    152.1 KB · Views: 20
  • 1608586988215.JPEG
    1608586988215.JPEG
    167.5 KB · Views: 20
  • 5.jpg
    5.jpg
    228.4 KB · Views: 20
Back
Top