Velvet_Hammer
Filing Flight Plan
- Joined
- Oct 10, 2021
- Messages
- 15
- Display Name
Display name:
Velvet_Hammer
Subject line says it all. Is it getting better/worse? 6 months ago it was the GNX375 and 750's that were a long ways out....
Subject line says it all. Is it getting better/worse? 6 months ago it was the GNX375 and 750's that were a long ways out....
I was supposed to fly across town this morning to pickup my buddy after dropping off his airplane at the avionics shop for a 255 radio install but didn't because the radio did not come in. It was ordered back in March along with 650 GPS,I275and GMA345 audio panel. The GPS, I275 and audio panel came in in July and they installed those 3 but the radio was not supposed to ship until Aug2. The avionics shop says now Garmin is saying Sept 23 for the radio to ship.Subject line says it all. Is it getting better/worse? 6 months ago it was the GNX375 and 750's that were a long ways out....
A little thread drift here, with apologies, but rather than start a new "lead time" thread, does anyone have any idea about the lead times for a JPI 900 (6 cylinder/2 tanks).
Last July, I ordered (through avionics shop) a G3X and gfc500 for whole panel uograde in my Comanche. Delivery was supposed to be December, pushed back to Feb, then April, now expected 6/23. :-(