Pre-takeoff checklist
For any of the TERPS folks out there:
What is the process for a site survey? Do all approaches need to be reevaluted? What about obstacles?
I ask because my home airport (N51) for instance had 04's threshold modified. As a result, a Safety NOTAM was issued to restrict straight-in minimums on the LNAV. What we don't understand is that after a new site survey happened and they updated the runway slope, the restriction wasn't lifted. When we inquired on why we got:
"THE AIRPORT HAS DISPLACED RWY 4 THLD WITHOUT PRIOR NOTIFICATION TO THE FAA/EFPT/ADO FOR PROCEDURE RE-DESIGN/DEVELOPMENT...UNTIL FURTHER DOCUMENTATION AND EVALUATION CAN BE OBTAINED AND CONDUCTED THE RESTRICTIONS WILL REMAIN IN PLACE. THIS WAS AN EFPT REQUEST FOR SAFETY NOTAMS."
But if they did a site survey, shouldn't all published procedures be also re-evaluted? Or is that not required? Anyone know?
What is the process for a site survey? Do all approaches need to be reevaluted? What about obstacles?
I ask because my home airport (N51) for instance had 04's threshold modified. As a result, a Safety NOTAM was issued to restrict straight-in minimums on the LNAV. What we don't understand is that after a new site survey happened and they updated the runway slope, the restriction wasn't lifted. When we inquired on why we got:
"THE AIRPORT HAS DISPLACED RWY 4 THLD WITHOUT PRIOR NOTIFICATION TO THE FAA/EFPT/ADO FOR PROCEDURE RE-DESIGN/DEVELOPMENT...UNTIL FURTHER DOCUMENTATION AND EVALUATION CAN BE OBTAINED AND CONDUCTED THE RESTRICTIONS WILL REMAIN IN PLACE. THIS WAS AN EFPT REQUEST FOR SAFETY NOTAMS."
But if they did a site survey, shouldn't all published procedures be also re-evaluted? Or is that not required? Anyone know?
Last edited: